UPDATE: U.S. 27, MLK exit re-opened to traffic after repair work - WRCBtv.com | Chattanooga News, Weather & Sports

UPDATE: U.S. 27, MLK exit re-opened to traffic after repair work

Posted: Updated:

UPDATE: The Tennessee Department of Transportation has finished repair work on the pothole on U.S. 27 and has shored up the bridge deck

TDOT crews are expected to remove the lane closures, restoring all lanes for traffic. The MLK Boulevard exit ramp will be reopened once the traffic control has been removed.


PREVIOUS STORY: Tennessee Department of Transportation officials are working to repair a weak spot on the existing bridge on U.S. 27 North over 12th St.

Officials say crews discovered the spot while investigating a pothole on the bridge.

If not repaired, the weak spot could potentially result in more damage to the bridge over time.

As a result, the outside lane of the bridge on U.S. 27 North will be closed for construction.

Officials say the exit ramp to MLK Blvd. will also be closed due to the repairs.

Drivers who take the bridge for morning commute, are urged to seek an alternate route Thursday morning.

Officials recommend drivers use the Market St. or 4th St. exit.

The repair is expected to be completed, with lanes on the bridge and the MLK Blvd. exit ramp re-opened, by Thursday afternoon.

If you must use this area for travel, drivers are urged to use caution and be patient.

Powered by Frankly